Bid Board
The Bid Board includes information on current Bid Opportunities/Requests for Proposal (RFPs), Prequalification Opportunities for Contractors and Design Builders, Qualification Opportunities for Design Professional and Consultant Services (RFQs), and Recent Bid Results.
The information on the Bid Board is for information purposes only and is subject to change without notice. Contact the individual listed to verify requirements and obtain recently published advertisements and updates.
Resources
Bid Opportunities / Request for Proposals
Project Name | CTSA Instructional Spaces Phase 2: Little Theatre and Nixon Theatre & CTSA Instructional Spaces Phase 3: Winifred Smith Hall |
Project Number | 5112853 & 5113125 (Announcement) |
Estimated Construction Cost | $1,340,000 & $860,000 |
Due Date | November 27, 2024 by 2:00pm |
Contact Person | Brenda Medina |
Status | Send requests for Bid Documents to contact person(s) listed. |
Project Name | BLI Lab R-120 Exhaust Fan Replacement |
Project Number | 5113049 (Announcement) |
Estimated Construction Cost | $265,000 |
Due Date | November 21, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | SB-1 1st Floor Classroom Renovation |
Project Number | 5112904 (Announcement) |
Estimated Construction Cost | $600,000 |
Due Date | August 16, 2024 by 2:00pm |
Contact Person | Ladita McBride |
Status | Send requests for Bid Documents to contact person(s) listed. |
Project Name | Verano Place Grad Housing Wireless Network |
Project Number | 5112791-B (Announcement) |
Estimated Construction Cost | $3,500,000 |
Due Date | August 27, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Anteater Stadium Landscape and Hardscape Improvements |
Project Number | 5112769 (Announcement) |
Estimated Construction Cost | $1,600,000 |
Due Date | June 26, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | ICS 1 and 2 Renovation |
Project Number | 5112999 (Announcement) |
Estimated Construction Cost | $1,350,000 |
Due Date | June 25, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Med Surge 1 and 2 HVAC Repairs |
Project Number | 5112640 (Announcement) |
Estimated Construction Cost | $950,000 |
Due Date | June 24, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Student Center Catering Kitchen Exhaust |
Project Number | 5112855 (Announcement) |
Estimated Construction Cost | $996,000 |
Due Date | April 19, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Prequalification Opportunities
Project Name | Job Order Contract - Small Construction & Maintenance & Service Work |
Project Delivery | Job order contract (Announcement) |
Mandatory Conference Date | October 28, 2024 at 11:00 am |
Due Date | November 15, 2024 at 5:00 pm |
Estimated Construction Cost | $25,000 (minimum) to $5,000,000 (maximum) |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name | Job Order Contract - Small Construction & Maintenance Projects for Housing, Project No. 5112021 |
Project Delivery | Job order contract (Announcement) |
Mandatory Conference Date | October 30, 2024 at 9:00 am |
Due Date | November 8, 2024 at 5:00 pm |
Estimated Construction Cost | $500 (minimum) to $5,000,000 (maximum) |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name | Student Center Plaza Seismic Joint Repair, Student Center Fan Coil 1-10 Replacement, GENERAL CONTRACTORS (B License) |
Project Number | 5112834 & 5112956 (Announcement) |
Mandatory Conference Date | October 18, 2024 at 10:00 am |
Due Date | October 28, 2024 at 5:00 pm |
Estimated Construction Cost | $1,590,000 & $457,500 |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name | Job Order Contract - Small Construction & Maintenance Projects for Housing, Project No. 5112021 |
Project Delivery | Job order contract (Announcement) |
Mandatory Conference Date | October 17, 2024 at 11:00 am |
Due Date | November 1, 2024 at 5:00 pm |
Estimated Construction Cost | $500 (minimum) to $5,000,000 (maximum) |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name |
Student Center Fan Coil 1-10 Replacement - HVAC SUBCONTRACTORS (C20 License) |
Project Number | 5112956 (Announcement) |
Mandatory Conference Date | September 23, 2024 at 10:00am |
Due Date | October 7, 2024 at 5:00 pm |
Estimated Construction Cost | $457,500 |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Rowland Hall 5th Floor Chemistry Lab Renovations |
Project Number | 5113050 (Announcement) |
Mandatory Conference Date | Septmeber 12, 2024 at 10:00 am |
Due Date | September 25, 2024 at 5:00 pm |
Estimated Construction Cost | $600,000 |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Job Order Contract - Hazardous Material Abatement |
Project Number | 5112021 (Announcement) |
Mandatory Conference Date | September 4, 2024 at 1:00pm |
Due Date | September 20, 2024 at 5:00 pm |
Estimated Construction Cost | $25,000 - $2,000,000 |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person(s) listed. |
Project Name |
SC 22-23 CTSA - BUILDING SECURITY ENHANCEMENTS SC 22-23 ICS-1 - BUILDING SECURITY ENHANCEMENTS SC 22-23 LAW, ED. & MPAA BLDGS. - BUILDING ENHANCEMENTS |
Project Number | 5112903 & 5112908 & 5112909 (Announcement) |
Mandatory Conference Date | June 20, 2024 at 9:30 am |
Due Date | July 8, 2024 at 5:00 pm |
Estimated Construction Cost | $584,173 & $577,727 & $537,727 |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | CTSA Instructional Spaces Phase 2: Little Theatre and Nixon Theatre & CTSA Instructional Spaces Phase 3: Winifred Smith Hall |
Project Number | 5112853 & 5113125 (Announcement) |
Mandatory Conference Date | May 16, 2024 at 11:00 am |
Due Date | May 31, 2024 at 5:00 pm |
Estimated Construction Cost | $1,300,000 & $840,000 |
Contact Person | Brenda Medina |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Med Surge 1 & 2 HVAC Repairs |
Project Number | 5112640 (Announcement) |
Mandatory Conference Date | April 25, 2024 at 11:00 am |
Due Date | May 8, 2024 at 5:00 pm |
Estimated Construction Cost | $950,000 |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Engineering Tower MAQ |
Project Number | 5112761 (Announcement) |
Mandatory Conference Date | March 14, 2024 at 10:00 am |
Due Date | April 3, 2024 at 5:00 pm |
Estimated Construction Cost | $2,500,000 - $3,000,000 |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | SSOE Accelerated Labs ET 9th Floor |
Project Number | 5112808 (Announcement) |
Mandatory Conference Date | November 28, 2023 at 9 a.m. |
Due Date | December 13, 2023 by 5 p.m. |
Estimated Construction Cost | $2,240,000 |
Contact Person | Brenda Medina |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Student Center Catering Kitchen Exhaust - HVAC SUBCONTRACTORS (C20 License) |
Project Number | 5112855 (Announcement) |
Estimated Construction Cost | $996,000 |
Due Date | November 22, 2023 by 5 p.m. |
Contact Person | Abel Saldana |
Status | Addendum No.1 Send requests for required forms to contact person(s) listed. |
Project Name | Student Center Catering Kitchen Exhaust - GENERAL CONTRACTORS (B License) |
Project Number | 5112855 (Announcement) |
Estimated Construction Cost | $996,000 |
Due Date | November 22, 2023 by 5 p.m. |
Contact Person | Abel Saldana |
Status | Addendum No.1 Send requests for required forms to contact person(s) listed. |
Project Name | Metal Bridges Painting Treatment - Phase 2 |
Project Number | 5112736 (Announcement) |
Mandatory Conference Date | October 2, 2023 at 1:30 p.m. |
Submittal Due Date | October 16, 2023 at 5 p.m. |
Estimated Construction Cost | $1,300,000 |
Contact Person | Brenda Medina |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Gateway Ramps - Langson Library & Aldrich Hall |
Project Number | 999608 (Announcement) |
Mandatory Conference Date | July 17, 2023 at 10 a.m. |
Submittal Due Date | August 4, 2023 at 5 p.m. |
Estimated Construction Cost | $1,357,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Med Sci D356 Modular Clean Room |
Project Number | 5112471 (Announcement) |
Mandatory Conference Date | June 26, 2023 at 10 a.m. |
Submittal Due Date | July 12, 2023 at 5 p.m. |
Estimated Construction Cost | $770,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | ADA Handrail & Stair Upgrades - Multiple Buildings & DM 22-23 Exterior Stairwell Coating |
Project Number | 5112608 & 5112938 (Announcement) |
Mandatory Conference Date | June 12, 2023 at 10:30 a.m. |
Submittal Due Date | July 6, 2023 at 5 p.m. |
Estimated Construction Cost | $604,445 & $595,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Physical Sciences Chemical Storage Rooms |
Project Number | 5112376 (Announcement) |
Mandatory Conference Date | June 13, 2023 at 10 a.m. |
Submittal Due Date | June 30, 2023 at 5 p.m. |
Estimated Construction Cost | $785,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Palo Verde Grad Housing Wireless Network |
Project Number | 5112791-A (Announcement) |
Mandatory Conference Date | April 25, 2023 at 9 a.m. |
Submittal Due Date | May 15, 2023 at 5 p.m. |
Estimated Construction Cost | $3,000,000 |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Verano Place Grad Housing Wireless Network |
Project Number | 5112791-B (Announcement) |
Mandatory Conference Date | April 25, 2023 at 9 a.m. |
Submittal Due Date | May 15, 2023 at 5 p.m. |
Estimated Construction Cost | $3,750,000 |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Request for Qualifications (RFQ) for Professional Services
Project Name | Programming & Cost Estimating Services (Announcement) |
Submittal Due Date | October 24, 2024 at 4 p.m. |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person listed above. |
Project Name | 2024-2026 Energy Consulting Services (Announcement) |
Submittal Due Date | August 5, 2024 at 2 p.m. |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person listed above. |
Project Name | Building Technology and Forensic Consulting Services (Announcement) |
Submittal Due Date | June 24, 2024 at 5 p.m. |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person listed above. |
Project Name | Mechanical, Electrical, and Plumbing (MEP) Design Services (Announcement) |
Submittal Due Date | April 8, 2024 at 2 p.m. |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person listed above. |
Project Name | Below Grade Waterproofing Parkview and Summer Session B (Announcement) |
Submittal Due Date | September 5, 2023 at 2 p.m. |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person listed above. |
Recent Bid Results
Project Name | ADA Upgrade - Signage and Door Hardware |
Project Number | 5112607 |
Estimated Construction Cost | $390,000 |
Due Date | November 19, 2024 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | SC 22-23 ICS-1 - Building Security Enhancements |
Project Number | 5112908 |
Estimated Construction Cost | $577,727 |
Due Date | September 30, 2024 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | Aldrich Hall ADA Ramp |
Project Number | 5112740 |
Estimated Construction Cost | $230,000 |
Due Date | October 30, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | UCI Learning Landscapes - Santa Ana Madison & Angels Parks |
Project Number | 5113149 |
Estimated Construction Cost | $150,000 |
Due Date | October 18, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Verano Place Grad Housing Wireless Network |
Project Number | 5112791-B |
Estimated Construction Cost | $3,500,000 |
Due Date | August 27, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Plumwood House 323 Autoclave Installation |
Project Number | 5113000 |
Estimated Construction Cost | $40,000 |
Due Date | Septmeber 19, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | SB-1 1st Floor Classroom Renovation |
Project Number | 5112904 |
Estimated Construction Cost | $600,000 |
Due Date | August 16, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Building Safety Mitigation Phase-4 |
Project Number | 5112277 |
Estimated Construction Cost | $600,000 |
Due Date | August 19, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Med Surge 1 & 2 HVAC Repairs |
Project Number | 5112640 |
Estimated Construction Cost | $950,000 |
Due Date | July 9, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | ICS 1&2 Renovation |
Project Number | 5112999 |
Estimated Construction Cost | $1,350,000 |
Due Date | July 2, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Med Sci D356 Modular Clean Room |
Project Number | 5112471 |
Estimated Construction Cost | $776,000 |
Due Date | November 20, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Grad Housing Wireless Network |
Project Number | 5112791 |
Estimated Construction Cost | $3,000,000 |
Due Date | October 19, 2023 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Crawford Athletic Complex Pathways |
Project Number | 5112766 |
Estimated Construction Cost | $485,000 |
Due Date | May 15, 2024 by 2:00pm |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | Fresh Hub Student Service West Roofing |
Project Number | 5112893 |
Estimated Construction Cost | $270,000 |
Due Date | May 6, 2024 by 2:00pm |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Metal Bridges Painting Treatment Phase 2 |
Project Number | 5112736 |
Estimated Construction Cost | $1,300,000 |
Due Date | April 8, 2024 by 2:00pm |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Law Library Restroom Renovation |
Project Number | 5112803 |
Estimated Construction Cost | $280,000 |
Due Date | March 18, 2024 by 2:00pm |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | ADA Handrail & Stair Upgrades - Multiple Buildings |
Project Number | 5112608 |
Estimated Construction Cost | $604,445 |
Due Date | October 20, 2023 by 2:00pm |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | SCIP 21/22: McGaugh Hall 3416/3445 Aquatic Lab |
Project Number | 5112723 |
Estimated Construction Cost | $350,000 |
Due Date | December 13, 2023 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Med Sci D356 Modular Clean Room |
Project Number | 5112471 |
Estimated Construction Cost | $776,000 |
Due Date | November 20, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Student Center East & West Food Court Flooring Renovation |
Project Number | 5112984 |
Estimated Construction Cost | $150,000 |
Due Date | November 20, 2023 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | DM 22-23 Exterior Stairwell Coating |
Project Number | 5112938 |
Estimated Construction Cost | $595,000 |
Due Date | October 20, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Humanities Gateway & HIB GIF Restrooms |
Project Number | 5112752 |
Estimated Construction Cost | $350,000 |
Due Date | October 11, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Grad Housing Wireless Network |
Project Number | 5112791 |
Estimated Construction Cost | $3,000,000 |
Due Date | October 19, 2023 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | SCIP 21/22 - Calit2 Floor 3 - RCIC |
Project Number | 5112782 |
Estimated Construction Cost | $394,000 |
Due Date | October 17, 2023 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | Bren Event Center - HVAC Modernization |
Project Number | 5112512 |
Estimated Construction Cost | $3,150,000 |
Due Date | September 22, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Data Center Lab C HX Cooling Unit Addition |
Project Number | 5112901 |
Estimated Construction Cost | $52,000 |
Due Date | October 5, 2023 by 2 p.m. |
Contact Person | Gustavo Valle |
Status | Notice of Intent to Award |
Project Name | Air Handler Replacements 2023 |
Project Number | 5112867 (Announcement) |
Project Delivery Method | Design Build |
Submittal Due Date | BAFO - Technical Proposal: August 4, 2023; 2 p.m. BAFO - Lump Sum Base Proposal: August 4, 2023; 2 p.m. |
Maximum Acceptance Cost | $7,846,612 |
Contact Person | Gustavo Valle |
Contact Person | Gustavo Valle |
Prequalified Proposers | MESA ENERGY SYSTEMS, INC., Irvine, CA 92602, 949-460-0460 PPC AIR CONDITIONING, INC., Cypress, CA 90630, 714-952-2100 XCEL MECHANICAL SYSTEMS, INC., Gardena, CA 90249, 310-660-0090 |
Status | Notice of Intent to Award |
Project Name | Crawford Hall Gym Floor Replacement |
Project Number | 5112758-A |
Estimated Construction Cost | $650,000 |
Due Date | April 13, 2023 by 2 p.m. |
Contact Person | Gustavo Valle |
Status | Notice of Intent to Award |
Project Name | State Funds 2021 Building Envelope, SLH, CTT, Studio 4 & HH |
Project Number | 5112810 (Announcement) |
Project Delivery Method | Design Build |
Submittal Due Date | Technical Proposal: March 24, 2023; 4 p.m. Lump Sum Base Proposal: March 24, 2023; 4 p.m. |
Maximum Acceptance Cost | $9,276,642 |
Contact Person | Gustavo Valle |
Due Date | PPC AIR CONDITIONING, INC., Cypress, CA 90630, 714-952-2100 THE WHITING-TURNER CONTRACTING COMPANY, Irvine, CA 92602, 949-863-0800 |
Status | Notice of Intent to Award |
Project Name | EG 2118 Fumehood |
Project Number | 5112821 |
Estimated Construction Cost | $175,000 |
Due Date | February 16, 2023 at 2 p.m. |
Contact Person | Rosa Hernandez |
Status | Notice of Intent to Award |
Project Name | Crawford Hall Gym Floor Replacement |
Project Number | 5112758 |
Estimated Construction Cost | $350,000 |
Due Date | February 9, 2023 at 2 p.m. |
Contact Person | Gustavo Valle |
Status | Notice of Intent to Award |